by DueWizard70 » Fri Jul 02, 2021 5:26 pm
The Utembo Times
January 4940
BACKDATED POST(Very backdated)
Frigate and landing craft canceled. Slow progress on bomber
Today, we received an announcement from the Ministry of Defense. They announced that the projects for designing and building a frigate and landing craft for the Utemban Navy have been officially scrapped. After investing millions of Utemban Florin into the project, the Ministry of Defense decided it would be better to stop it entirely.
An insider source has told us that the reason for cancelling the projects is that they had not gotten any actual development done in over 2 years. It seems that, without any foreign aid, the Utemban engineers could not figure out how to get everything working, and as such the Ministry decided to kill the project to stop it from eating up funds.
As for the other two development projects, the bomber and the surface to air missile, there are mixed results. The bomber seems to be developing well, albeit slowly, and has a tentative date of completion of 4948. The surface to air missile, however, seems to have stagnated too and could be headed to an early grave.
4938 Protestors still in judicial limbo
Following the massive pro-democracy protests from 4938, thousands were arrested. Today, we got information that many of them remain in jail, and have had a trial. This has drawn the attention of several human rights organisations in Utembo, who demand that the protestors either be released or be allowed to have a trial.
There have been no official statements from part of the government.
People's Front Kundrati -ACTIVE (4731-4889, 5142-)
Institutional Reform Party Baltusia-INACTIVE (4889-4896)
Demokratische Hosianer von Dorvik Dorvik-INACTIVE (4908-4918)
Third World Controler of Utembo(4851-4953)